Commercial Projects
Kurnell Tug Wharf
- The construction of Steel Wharf and Jetty for Caltex to replace the aging timber Jetty.
- The piles that were used were 508mm of steel that were up to 27m long
- The project was undertaken as a joint venture
Please click on the images below to enlarge - for more images, please refer to our gallery page
Lilli Pilli Sewer Reinstatement
- Reinstatment of 23m of sewer mains that had failed due to a landslide
- The Reinstatment included steel micro piles drilled below the sewer main with steel curtain retaining walls designed to prevent any more slippage
- The project was undertaken on private property for Sydney Water
Condell Park Civil Works
- 125m pre-fabricated concrete retaining wall that was up to 6m high.
- The retaining wall formed the boundary for the sub-division of one large parcel of land
- Other works which were carried out included on-site maintenance for a period of 6 months
- One of the issues that were encountered was the de-watering of the site with council approval with approximately 3 hundred thousand litres of water pumped into the storm water system.